Search In this Thesis
   Search In this Thesis  
العنوان
Time-cost trade-off construction projects applied on a single tower crane /
الناشر
Yasser Mahmoud Ragab Aboel Magd ,
المؤلف
Aboel Magd, Yasser Mahmoud Ragab
الموضوع
Structural Engineering Construction
تاريخ النشر
2006
عدد الصفحات
120 P.:
الفهرس
Only 14 pages are availabe for public view

from 127

from 127

Abstract

Tower crane is one of the most important equipments in construction projects. Optimum location of a crane can affect highly in project budget and time schedule. The objective of this research is to utilize new mathematically based technique to investigate site for optimum available crane locations inside and outside the feasible area, taking in consideration search time. For this purpose three models were developed. The first model is the explicit mathematical model investigates the fbasible area only. The second model utilizes’genetic algorithm combined in AlA TL4B to search the whole site. The third model is a modification of the genetic algorithm explores pit-defined area for the optimum location. A FORTRAN program developed to determine the minimum crane arequired and feasible area of crane. Several controlling parameters identified as “cfrcwrisdcs of crane, size of feasible area .etc.” to determine the optimum location. Assessment for the three-awarded models made to illustrate power and weak points of each technique.
Finally, a dimensional case study was established and analyzed.