تأثیر البرامج الزمنیة على الحد من مخاطر مشروعات التشیید
دراسة حالة مشروع مستشفى بھتیم -مصر/
المؤلف
الصلاحى،عمرو مجدى محمد رشاد.
هيئة الاعداد
باحث / عمرو مجدى محمد رشاد الصلاحى
مشرف / ايمن حسين حسني
مشرف / هبةالرحمن أحمد
مناقش / عادل أبو اليزيد السلامونى
تاريخ النشر
2015.
عدد الصفحات
218ص.؛
اللغة
العربية
الدرجة
ماجستير
التخصص
الهندسة المدنية والإنشائية
تاريخ الإجازة
1/1/2015
مكان الإجازة
جامعة عين شمس - كلية الهندسة - انشاءات
الفهرس
يوجد فقط 14 صفحة متاحة للعرض العام

from 32

from 32

المستخلص

The planning phase is considered one of the most important phases
throughout the project because it is the first indicator of the success or failure of the project
under the circumstances and risks surrounding it.
Neglecting this phase is considered one of the main reasons for the failure of many construction
projects as a result of poor planning, and not taking all the factors affecting the project in
mind, which negatively affects the time and cost of the project.
This papers discusses the impact of using time schedules on the economics of construction projects
through a case study ”one day case surgery hospital - bahteem district” where the project’s time
schedule has been studied and been compared with the actual time needed for implementation with
discussing the surrounding reasons for the project delay.
It also studies the effect of the selection of construction materials on the project economics, and
how to handle a delayed project using innovative building materials (insulating bricks).
In addition, the study addresses the effect of both factors -time scheduling and innovative
building materials- in reducing the risks related to the case study, and for that purpose a
quantitative and a qualitative analysis were made for the risks surrounding the project before and
after using the innovated building materials in the project.
Chapter I reviews the structure of the research, where it reviews the research problem and
hypotheses based upon this research, and claryifing how to verify those hypotheses, It also reviews
the research objectives and importance from the scientific and economic perspective. And finally,
the first chapter clarify the time frame of the case study in addition to the research methodology
and previous similar studies.
Chapter II deal with the risks of construction projects as it was reviewing a range of risks they
may face construction projects in general, and could affect project parties in particular.
It also reviewed how to measure those risks and to knowing its impact on the project and then how
to deal with it appropriately.
And finally review the benefits of applying risk analysis and risk management techniques on project
parties and find out the time and cost