العنوان
محددات التحكم فى تكلفة تنفیذ المشروعات القومیھ للاسكان
فى مصر /
المؤلف
السید، أحمد صبحى عبد الحلیم.
هيئة الاعداد
باحث / أحمد صبحى عبد الحليم السيد
مشرف / ضياء الدين ابراھيم محمد
مشرف / حازم محمد طلعت الدالى
مناقش / علي محمد فتحي عيد
مناقش / رويده محمد رضا كامل
الموضوع
الهندسة المدنية.
تاريخ النشر
2014.
عدد الصفحات
241ص. :
اللغة
العربية
الدرجة
ماجستير
التخصص
الهندسة المدنية والإنشائية
تاريخ الإجازة
1/1/2014
مكان الإجازة
جامعة عين شمس - كلية الهندسة - قسم الھندسة المعمارية
الفهرس
يوجد فقط 14 صفحة متاحة للعرض العام

from 241

from 241

المستخلص

The research aims to determine the set of determinants that control
reducing the cost of implementation of housing projects in Egypt, to be
utilized in improving the rates of performance of the project in all its
aspects, and thus raise the economic efficiency of the housing project and
reducing the cost of implementation to the maximum extent possible, in
order to achieve the implementation of the greatest possible number of
residential units in accordance with the resources of available financing,
and contribute in solving the housing problem. To reach these
determinants the Research is based on the two main parts, namely the
theoretical and applied studies as follows:
Part I: Theoretical Study:
This part is pertaining to the contents of the first, second and third
chapters. the First Chapter of the research is focused on the study of the
resources impact on the cost of the project implementation.
Consequently,identifying the set of actions to be taken regarding the
organization and management of project resources to reach the maximum
possible reduction in the cost of implementation(standard ruler). Then the
study in the Second Chaptert ends to study the value engineering
methodology and work plan, as one of the scientific methods to identify
the areas where unnecessary cost incurred in the projects and work on
eliminating it leading to a reduction in the cost of implementation. In
Third Chapter the study tackled one subject of the National Housing
Project in Egypt which called ”Ebny Betak”. The study includes its
targets, importance and the principals on which the implementation
mechanisms and financing which the popject is based on.
Part II: Appliedand Comparative Analytical Studies:
This was discussed in the Fourth Chapter, where applied and comparative
analytical studies were made on different models of projects in Egypt. In
order to analyze these models, beside testing and comparing the test
group of the theoretical determinants drawn from the First Chapter
(standard ruler) to the actual status in Egypt.In addition to the application
of value engineering approach to the projects under study and to locate
the areas of unnecessary cost in the project. And significantly reduce the
cost of implementation to the maximum degree, right down to the
actualset of determinants influencing the cost of implementation in
Egypt, which is the general framework of the current research