Search In this Thesis
   Search In this Thesis  
العنوان
Development and application of a pavement maintenance decision support system for Egypt /
المؤلف
Mandeel, Fathy Mahmoud Mohamed.
هيئة الاعداد
باحث / فتحي محمود محمد منديل
مشرف / اسماعيل عبد الحميد باشا
مشرف / عصام عبدالعزيز شرف
مشرف / عصام عبدالعزيز شرف
الموضوع
Pavements. Maintenance. Civil Engineering.
تاريخ النشر
1996.
عدد الصفحات
xvzi, 373 P. :
اللغة
الإنجليزية
الدرجة
الدكتوراه
التخصص
الهندسة المدنية والإنشائية
تاريخ الإجازة
1/1/1996
مكان الإجازة
جامعة الزقازيق - كلية الهندسة - الهندسة المدنية
الفهرس
Only 14 pages are availabe for public view

from 32

from 32

Abstract

Pavements are considered the mam vem of economic growth in every country ,as they facilitate the movement of people and goods. They are the major capital investment which should be expected to show an adequate return on xpenditure . Pavements will be deteriorated under the effect of different conditions of loading and environment , which in turn accelerates the rates of pavement performance losses . So they need maintenance from time to time to
maintain them properly at a high standard of serviceability . The time and level of maintenance is a function of a complex set of constraint variables such as limited funds and serviceability of the pavement . Furthermore , there are economic
restraints are being imposed on the highway network due to decreased revenues , high inflation and an mcrease in the required maintenance / rehabilitation of the existing network . This arises the need to manage pavement maintenance and to
develop a pavement maintenance decision system capable to assist d cision
making for identifying maintenance needs subject to limited resources.
The goal of the proposed research was based on developing a pavement
maintenance Decision Support System ( DSS ) for Egypt highway network. The
intention of the DSS was to provide a basis to the decision maker ( or the top
management) to be used as a framework for setting pavement maintenance
planning and priorities for Egypt highway network . Four, different, ranking techniques and a combined index ranking technique were used beside an
optimization technique . These techniques were used for setting pavement maintenance priorities under the different proposed constraints of budget ,
pavement condition, traffic, .... etc . Also, different models were developed and others were predicted to be used in the Life Cycle Cost analysis ( LCC ) process .